VENUS Geomagnetic and Electric Fields
Observation System
VENUS : "Versatile Eco-monitoring Network
by Undersea-cable System"
Dry Dock Test (July 12-15, 1999,
at Misaki-Senpaku-Kogyo Co.Ltd.)
(Photo-1) Top view of "Geomagnetic and Electric Fields Observation System"
Interconnection cable (length : 300m) wound round the drum on the left
is extended by ROV toward the branching unit, and the system is connected
with the junction box using the shorter part of cable (about 30m) on the side
of the drum, which is dragged out in this picture.
(Photo-2) Dry Dock Test in 1999
Performance of contolling equipment and data transmission was
confirmed. Acquired data include artificial noises owing to unavoidable
circumstances of the test site. In the similar test in 1998 at the same
site, large electric field out of measurement range was detected at the
electrode spacing of around 2m, and shorter electrode spacing was adopted
this time.
3 electrodes are put together in a bundle at the fore side as seen
in the picture.
There are 3 electrodes A,B and C, where the 2 component potential
differences A-B and C-B are observed. 3 electrodes are bundled in the order
of A-B-C, and the electrode separation is about 20 cm for each component. The
observation data revealed an anti-parallel variation between 2 components,
and also variations correlated with the ones of magnetic field by the
fluxgate magnetometer, which suggests the valid function of the equipment.
Sample record of Dry Dock Test in 1999
(Photo-3) General view of test site
The dock was filled with sea water during the over-night operation
test. The picture shows the situation of inspecting equipments, when sea
water was mostly pumped out.
The top of picture is the toll bridge connecting Jogashima Is. with
Misaki.