Dry Dock Test (July 12-15, 1999, at Misaki-Senpaku-Kogyo Co.Ltd.)

Top view of Equipment  
 
(Photo-1) Top view of "Geomagnetic and Electric Fields Observation System"
  Interconnection cable (length : 300m) wound round the drum on the left is extended by ROV toward the branching unit, and the system is connected with the junction box using the shorter part of cable (about 30m) on the side of the drum, which is dragged out in this picture.
Layout of electrodes at test site  
 
(Photo-2) Dry Dock Test in 1999
  Performance of contolling equipment and data transmission was confirmed. Acquired data include artificial noises owing to unavoidable circumstances of the test site. In the similar test in 1998 at the same site, large electric field out of measurement range was detected at the electrode spacing of around 2m, and shorter electrode spacing was adopted this time.
  3 electrodes are put together in a bundle at the fore side as seen in the picture.
  There are 3 electrodes A,B and C, where the 2 component potential differences A-B and C-B are observed. 3 electrodes are bundled in the order of A-B-C, and the electrode separation is about 20 cm for each component. The observation data revealed an anti-parallel variation between 2 components, and also variations correlated with the ones of magnetic field by the fluxgate magnetometer, which suggests the valid function of the equipment.
Sample record of DockTest 
 
Sample record of Dry Dock Test in 1999
General view of test site  
 
(Photo-3) General view of test site
  The dock was filled with sea water during the over-night operation test. The picture shows the situation of inspecting equipments, when sea water was mostly pumped out.
  The top of picture is the toll bridge connecting Jogashima Is. with Misaki.