Nakatsuka's Home > Venus OBEM > Deepsea Landing

VENUS  Geomagnetic and Electric Fields Observation System

VENUS : "Versatile Eco-monitoring Network by Undersea-cable System"
 

VenusOBEM Top Specification || Dry Dock Test || Deepsea Landing || Deployment and Connection

to Japanese Page

Deepsea Landing of Equipment (VenusOBEM)
(Sep.7-22, 1999 ; "Kaiyo" cruise)

DeepTow with VenusOBEM   
  "VENUS Geomagnetic and Electric Fields Observation System" (VenusOBEM) assembled with Deep-Tow.
DeepTow Launching   
  Deep-Tow with VenusOBEM going into sea water.
  (Sep.22, 1999)
VenusOBEM Landed   
  Equipment (VenusOBEM) soon after landing.
  (Vertical video image taken from Deep-Tow frame)

VenusOBEM Top Specification || Dry Dock Test || Deepsea Landing || Deployment and Connection