VENUS Geomagnetic and Electric Fields
Observation System
VENUS : "Versatile Eco-monitoring Network
by Undersea-cable System"
Deployment and Connection of Equipment (VenusOBEM)
(Sep.24-Oct.17, 1999; "Kairei" cruise)
"Kaiko", a remotely operated vehicle(ROV), used for the deployment and
interconnection with Branching unit.
Aproaching to the equipment (VenusOBEM).
10:29 AM, Oct.1, 1999 (Kaiko Dive #130)

Cable drum (reel) was not stable enough because of too light weight
after unrolling the cable.
It was judged that the cable connection with the branching unit should
be carried out after stabilizing the cable drum.
Electrodes were pulled out using the manipulator of ROV, and the
cables were stretched to get the span between electrodes.
Cable Drum was stabilized using "S" hooks and lead weights,
in another dive (Kaiko Dive #131).
ROV connectors at the Junction Box of Branching Unit.
After stabilizing the Cable Drum, the interconnection with the
Branching Unit was accomplished.
Then, the cable power was supplied from the land station and the
operation of each equipment was inspected. There was no defect in
operation.
Sample record from Real Deepsea Site